training Becoming A Sales Hero In Disruption Wave,pelatihan Becoming A Sales Hero In Disruption Wave,training Becoming A Sales Hero In Disruption Wave Batam,training Becoming A Sales Hero In Disruption Wave Bandung,training Becoming A Sales Hero In Disruption Wave Jakarta,training Becoming A Sales Hero In Disruption Wave Jogja,training Becoming A Sales Hero In Disruption Wave Malang,training Becoming A Sales Hero In Disruption Wave Surabaya,training Becoming A Sales Hero In Disruption Wave Bali,training Becoming A Sales Hero In Disruption Wave Lombok,pelatihan Becoming A Sales Hero In Disruption Wave Batam,pelatihan Becoming A Sales Hero In Disruption Wave Bandung,pelatihan Becoming A Sales Hero In Disruption Wave Jakarta,pelatihan Becoming A Sales Hero In Disruption Wave Jogja,pelatihan Becoming A Sales Hero In Disruption Wave Malang,pelatihan Becoming A Sales Hero In Disruption Wave Surabaya,pelatihan Becoming A Sales Hero In Disruption Wave Bali,pelatihan Becoming A Sales Hero In Disruption Wave Lombok

Pelatihan Corona and Partial Discharge

   Pendahuluan Training Corona and Partial Discharge

   Partial  Discharge  (PD),  as its name would suggest, is an electrical

   discharge  that  occurs across a portion of the insulation between two

   conducting electrodes, without completely bridging the gap. PD’s are

   caused when there is a discontinuity in the insulation system and as a

   general  ‘rule-of-thumb’  PD  will  occur  in systems operating at

   voltages  of  3000V and above (although it should be noted that PD can

   occur at lower voltages than this).

   Partial  discharges  can  occur  in  voids in solid insulation (paper,

   polymer  etc),  along  the  interfaces of multi-layer solid insulation

   systems, in gas bubbles in liquid insulation or around an electrode in

   a  gas  (corona  discharge).  Partial  Discharge activity can initiate

   under  normal  working  conditions in high voltage equipment where the

   insulation   condition  has  deteriorated  with  age,  has  been  aged

   prematurely by thermal or electrical over-stressing or due to improper

   installation (this leads to ‘infant mortality’).

   PD  can  often be observed with the commissioning of new equipment due

   to improper installation, poor design and/or workmanship (this is seen

   particularly  in  cable  joints  and terminations which are made-up on

   site).  It  is  known  that  poor  workmanship  can  lead to ‘infant

   mortality’  of  MV/HV networks with a disproportionate percentage of

   insulation  failures  being  observed  within  the  first 1-3 years of

   service compared to the rest of the service life of the cables/plant.

   PURPOSE

    1. To  understand the basics of stator winding insulation systems and

       why they deteriorate

    2. To understand basic Corona and Partial Discharge theory

    3. To understand how Partial Discharge detection devices work

    4. To  interpret  the  test  data  collected  and  relate the data to

       specific failure mechanisms, to enable you to plan maintenance

   WHO SHOULD ATTEND

    1. Engineers   working   in   HV   department,  in  transmission  and

       distribution

    2. Maintenance engineers working in HV equipments

    3. Senior technicians working in HV equipments

   MATERI Training Corona and Partial Discharge

    1. Introduction to Corona and Partial Discharge

    2. Diagnostics   Corona   and  Partial  Discharge  for  High  Voltage

       Equipment

    3. Equipment failure mechanisms

    4. Conventional and unconventional test techniques

    5. On-line and Off-line methods

    6. How to test different items of plant

    7. Deployment  of  Corona  and  Partial  Discharge  Testing  in Asset

       Management Programs

    8. Ageing population problem

    9. Focus plant replacements/avoid unplanned outage

   10. Increasing failure rate or problem with a particular plant type

   11. Troubleshooting and failure investigations

   12. Safety (mostly with cable terminations and sealing ends/outdoor HV

       plant)

   13. Quality Assurance

   14. Corona  and  Partial Discharge Testing, and Diagnostics for MV and

       HV Cables

   15. Introduction to test methodologies

   16. PD Location methods

   17. Assessing criticality

   18. PD Testing and Diagnostics for MV Switchgear

   19. Partial   Discharge   Testing   and  Diagnostics  for  Motors  and

       Generators

   20. Introduction to Online PD Testing of HV Motors and Generators

   21. Recognizing Phase-Resolved PD (PRPD) Patterns

   22. Assessing criticality

   23. Case studies

Metode Training Corona and Partial Discharge

   Presentation

   Discussion

   Case Study

   Evaluation

Lokasi Pelatihan Tahun 2021 :

Yogyakarta, Hotel Dafam Seturan

Jakarta, Hotel Amaris La Codefin Kemang

Bandung, Hotel Grand Serela Setiabudhi

Bali, Hotel Ibis Kuta

Lombok, Hotel Jayakarta

Catatan :

  • Waktu pelatihan Dua+1* hari dengan Biaya tersedia untuk Perorangan, Group, dan Inhouse Training, belum termasuk akomodasi/penginapan.
  • Untuk biaya dan jadwal training harap menghubungi marketing kembali

Investasi training:

Investasi pelatihan selama dua hari tersebut menyesuaikan dengan jumlah peserta (on call). *Please feel free to contact us.

Apabila perusahaan membutuhkan paket in house training, anggaran investasi pelatihan dapat menyesuaikan dengan anggaran perusahaan.

Fasilitas training:

Free Penjemputan dari bandara ke hotel*.

Modul / Handout.

Flashdisk*.

Certificate of attendance.

FREE Bag or bagpacker.

Training Kit (Photo Documentation, Blocknote, ATK, etc).

2x Coffe Break & 1 Lunch.

Souvenir .